The Alberta Utilities Commission (AUC) directed the Alberta Electric System Operator (AESO) to suspend the application of Information Document 2018-019T (ID) regarding the determination of Rate STS (supply transmission services), Rate DTS (demand transmission services), and metering levels for distribution system connected generation. The Commission determined that the ID should be tested in the AESO 2018 Independent System Operator (ISO) tariff application proceeding (22942) before requiring parties to implement the change.
To view more of this post, please