In proceeding 28750, AltaLink Management Ltd. (AltaLink) applied to the Alberta Utilities Commission (the Commission) recover repair, replacement, and salvage expenses related to its transmission facilities that were destroyed in the 2023 spring wildfire and snow events that occurred after AltaLink filed its 2024-2025 general tariff application (GTA). AltaLink made a request to capitalize $18.5 million spent on repairing and replacing damaged assets and destroyed assets and to include $6.2 million in salvage expenditures in its GTA.[1]
To view more of this post, please